The Step by Step Process of Building a House in Bendigo

Imagine standing on your new block in Bendigo, the scent of native eucalyptus on the breeze and the promise of a home that reflects your style and needs. Yet building here brings its own considerations—bushfire safety, energy-efficiency requirements and local council approvals all influence each decision. Without a clear path, even the most exciting project can feel overwhelming.

That’s why a structured process matters. Drawing on more than twenty years of experience delivering custom homes, extensions and renovations across Bendigo, Yarrington Construction has refined a step by step roadmap that blends proven industry practice with local know-how. You’ll discover how to align your vision with realistic budgets, meet specialised requirements like BAL assessments and NatHERS ratings, and engage the right professionals for each phase.

In the pages that follow, you’ll find practical guidance and checklists for every stage—from clarifying project objectives and securing finance through to foundations, framing, inspections and handover. Each section is designed to keep your build on track, on budget and above all, enjoyable.

To begin, let’s start by assessing your needs and establishing a realistic budget—your foundation for a building journey you can savour as much as the finished home.

Step 1: Assess Your Needs and Establish Your Budget

Every successful build starts with a clear picture of what you need—and how much you can spend. Whether you’re planning a brand-new home, an extension or a renovation, defining the project scope and clarifying your priorities will steer every decision that follows. Skipping this step can lead to unexpected costs, delays or compromises on the features you really value.

Start by listing the functions and spaces you require now—and down the track. Do you need a dedicated home office or room for teenagers? Is single-level living a must for future accessibility? And don’t forget lifestyle additions like outdoor entertaining, solar readiness or specific heritage-style details if your block sits in a character precinct.

Once your “must-haves” are on paper, it’s time to translate aspirations into dollars. A detailed budget considers not just the builder’s quote but also land, consultants, permits, finishes and even the cost of new landscaping. Aim to set aside 10–15% of your total budget for unforeseen items—so a surprise soil remediation or upgraded fixtures doesn’t derail the whole project.

To help you refine these parameters, try our quick questionnaire below. It’s designed to prioritise essentials versus nice-to-haves and identify where you could flex scope to suit your wallet.

Quick Prioritisation Questionnaire

  1. Which three rooms are non-negotiable (e.g. kitchen, master suite, study)?
  2. What future changes might you need (e.g. ageing-in-place, growing family)?
  3. Which sustainability features top your list (e.g. 7-star energy rating, rainwater tank, solar)?
  4. Rate these in order of importance: location, size, custom detail level, outdoor space.
  5. What’s your maximum budget? What’s your comfortable budget?

Determine Your Project Objectives

Your project objectives bridge lifestyle goals and practical constraints. Think about:

  • Daily routines: Do you entertain often or need separate zones for working from home?
  • Resale appeal: Features like flexible floor plans, energy ratings and quality finishes add value.
  • Site ambitions: Sloping land could allow for split-level living or under-house storage—but may increase siteworks.

Clarifying these aims up front will guide every design meeting, contractor brief and cost estimate, ensuring your home truly reflects how you live.

Estimate and Break Down Costs

A rough total won’t cut it. Break your budget into major categories so you know where to adjust if you over- or underspend. Typical allocations look like this:

Budget ItemPercentage of Total
Land Acquisition20%
Design & Consultant Fees10%
Siteworks & Foundations10%
Construction (Shell & Core)45%
Finishes & Fittings10%
Landscaping & External Works5%

Beyond these, approvals (permits, BASIX/NatHERS reports, BAL assessments) and utilities connections usually add around 3–5% each. List estimated dollar values beside each line—this sharpens the focus when quotes start coming in.

Set a Realistic Budget and Contingency

Once you’ve totalled your allocations, compare against your maximum spend. If the numbers don’t align:

  • Revisit your scope questionnaire—can a downstairs study double as a guest room?
  • Shift emphasis between categories—perhaps simplify internal finishes to accommodate a larger deck.
  • Build in a 10–15% contingency fund and treat it as untouchable until truly needed.

A realistic budget is not about pinching pennies everywhere but about making informed choices. With clear objectives, a detailed cost breakdown and contingency in place, you’re ready to move on to financing your dream home with confidence.

Step 2: Secure Financing and Explore Construction Loan Options

With your budget and project scope defined, the next critical milestone is lining up the right finance. Building a home involves staged payments that differ from a standard home loan, so understanding construction loan structures and preparing your documents early will smooth the path from groundbreaking to handover.

Understand Construction Loan Structures

Construction loans differ from conventional mortgages in two key ways: how funds are released and how interest is charged. Instead of receiving a lump sum at settlement, you draw down funds progressively as work reaches agreed stages. During construction most lenders offer an interest-only period—meaning you pay interest only on the amount drawn, not the total loan.

A typical drawdown schedule might look like this:

Stage                   | Percentage of Total Loan
------------------------|-------------------------
Deposit & slab/base     | 10%
Frame and lock-up       | 25%
Fixing and fit-off      | 30%
Practical completion    | 25%
Retention (hand-over)   | 10%

This structure ensures you only pay for work as it’s completed and helps align your cashflow with builder progress claims.

Prepare Your Financial Documentation

Lenders require comprehensive evidence of your financial position before approving a construction loan. Begin gathering:

  • Recent payslips and ATO tax returns
  • Bank statements showing savings and investments
  • Details of existing liabilities (credit cards, car loans)
  • Contract of sale or title deeds for your land
  • Detailed cost estimates or builder’s tender schedule

Having these documents to hand speeds up pre-approval and prevents hold-ups when you need funds at each construction stage.

Obtain Loan Pre-Approval and Manage Cashflow

Securing pre-approval gives you confidence that funds will be available when you need them. To keep cashflow on track:

• Review your builder’s payment claims against the lender’s drawdown schedule—raise any discrepancies immediately.
• Set up a project calendar with anticipated draw dates and due-dates for interest payments during the build.
• Factor in a small buffer between your lender’s maximum draw and the builder’s request, in case of minor cost overruns.

By matching your loan structure to the build program, you’ll avoid delays, late-payment fees and unnecessary interest costs—keeping your project on budget and on time.

Step 3: Select and Acquire the Right Land in Bendigo

Choosing the right block sets the stage for an efficient, cost-effective build—especially here in Bendigo, where bushfire zones, clay-rich soils and council overlays all play a part. Before signing on the dotted line, run through this due-diligence checklist to avoid surprises and ensure your site can accommodate your design.

Land Due-Diligence Checklist

  • Arrange a soil test (geotechnical report) to confirm bearing capacity, drainage and any need for remediation.
  • Obtain a preliminary BAL assessment (see below) to understand your bushfire construction requirements.
  • Verify service availability: sewer, water, power, gas and NBN connections.
  • Review local council overlays: heritage precincts, flood or environmental overlays and any easements.
  • Commission a contour survey to pinpoint site levels, boundaries and potential cut-and-fill requirements.
  • Check road access and frontage—some blocks incur extra costs for driveways, retaining walls or crossover works.

Evaluate Site Characteristics

A thorough site appraisal guides both design and budget:

  • Orientation: North-facing living areas optimise solar gain in winter and reduce shading of solar panels.
  • Slope and contour: Gentle slopes can enhance drainage and create under-house storage; steep sites often add to excavation and retaining-wall costs.
  • Soil type: Bendigo’s clay soils can shrink and swell—knowing the soil profile up front helps determine whether a conventional slab or pier foundation is most economical.
  • Drainage: Identify natural water flows and low points to avoid pooling around foundations.
  • Services connections: Confirm proximity and installation costs for sewer mains, water meters, power poles or pits, gas connections and telecommunications.

Conduct a Preliminary BAL Assessment

Bendigo’s bushfire-prone environment demands early attention to Bushfire Attack Level (BAL). A certified bushfire consultant will:

  1. Map surrounding vegetation classifications and setback distances.
  2. Measure site slope relative to nearby trees or grasslands.
  3. Recommend an initial BAL rating (BAL-12.5 through BAL-FZ) that dictates construction standards under AS3959.

With this report in hand, your architect or designer can specify ember-guards, non-combustible materials and seal-up details that meet your BAL rating. For guidance on building in bushfire areas, see the CFA’s Build Smart resources.

Secure the Land Contract and Title

Once you’ve ticked off the technical checks, turn your attention to the purchase contract:

  • Negotiate key terms: deposit amount, settlement date, inclusion of fencing or driveway works.
  • Conditional contracts: include clauses for satisfactory soil tests, BAL confirmation and finance approval.
  • Cooling-off period: take advantage of your statutory cooling-off rights to review any outstanding reports.
  • Solicitor review: have your conveyancer or solicitor scrutinise the contract, titles and any easements or covenants before you commit.

With a clean contract and all reports satisfactory, you can proceed with confidence—your block is now primed for the next phase: designing and bringing your new Bendigo home to life.

Step 4: Engage an Architect or Designer and Finalise Your Home Design

Finding the right design partner is more than ticking a box—it shapes how your house feels, functions and performs. In Bendigo you’ll typically choose between three routes:

  • Custom home design: a unique home crafted around your brief. Greater freedom comes with higher design fees.
  • Project home plans: pre-drawn templates you can tweak. Quicker and cheaper, but less bespoke.
  • Kit homes: factory-made packages delivered to site. Predictable pricing and faster build, though with modular limits.

To get the most from any option, start with a clear brief. List functional needs (room counts, future growth, accessibility), illustrate your style preferences with sketches or photos, and spell out sustainability targets (7-star NatHERS, solar infrastructure, rainwater harvesting). Don’t forget a snapshot of your site constraints—your BAL rating, slope or existing trees.

Design rarely lands perfectly on draft one. Agree on a simple version-control system (e.g. “Issue A-1”, “Issue A-2”) and ask for indicative costs tied to major revisions. That way you can weigh each change against your budget in real time.

Before your first workshop, use this agenda to keep meetings focused:

  1. Review site opportunities and constraints
  2. Reconfirm project objectives and must-have spaces
  3. Present two or three initial layout options
  4. Discuss material palettes and sustainability features
  5. Update budget estimates and agree next steps

This structure ensures decisions are timely, informed and within your financial comfort zone.

Choose the Right Design Professional

Your designer should blend creative flair with local smarts. Look for:

  • Experience navigating Bendigo’s bushfire (AS3959) and energy (NatHERS/NCC 2022) requirements
  • A portfolio of energy-efficient homes, ideally with certified 7-star ratings
  • Positive homeowner references, especially from clients whose lifestyle needs mirror yours
  • Clear, responsive communication—so you never feel left in the dark

Whenever possible, meet on your block. A quick site walk reveals how well they read sun angles, prevailing winds and landscaping opportunities.

Develop Preliminary Plans and Cost Estimates

A smooth design phase flows through three stages:

  1. Concept Sketches: rough layouts showing room placement, orientation and site setbacks.
  2. Schematic Design: refined plans with dimensions, basic elevations and material suggestions.
  3. Design Development: detailed drawings pinpointing finishes, cabinetry, fixtures and an updated cost estimate.

At each checkpoint, compare the drawings to your budget breakdown. Early tweaks—like swapping a costly wall finish or reconfiguring a room—are far cheaper now than after permits are lodged.

Prepare Final Plans for Approval

Before you lock in your design and head into the approvals phase, make sure everything aligns:

  • Confirm AS3959 construction details for your BAL rating (ember guards, non-combustible materials, seals).
  • Verify your NatHERS energy model meets or exceeds 7-star thermal performance, including the whole-of-home score.
  • Compile all documentation: site plan, floor plans, elevations, BAL report, energy compliance certificate and consultant reports.

A pre-lodgement review—ideally with your designer or a planning consultant—can catch small omissions or errors that otherwise stall permits. With every detail squared away, you’ll enter Step 5 ready to tackle bushfire and energy compliance head-on, knowing your design is build-ready for Bendigo’s unique environment.

Step 5: Complete Bushfire Attack Level (BAL) Assessment and NatHERS Compliance

In Bendigo’s bushfire-prone environment and under the National Construction Code’s energy requirements, it’s vital to tackle both fire safety and thermal performance at once. A BAL assessment defines how exposed your home is to ember attack and radiant heat, and NatHERS modelling confirms you’ll meet—or exceed—a 7-star energy rating. By integrating these two steps early, you avoid costly redesigns or retrofit upgrades later on.

Commission a BAL Site Assessment

First, engage an accredited bushfire consultant to survey your block. They’ll:

• Map nearby vegetation classes and measure setback distances.
• Assess slope relative to fuel loads (e.g. grass, scrub, forest).
• Recommend a BAL rating (BAL-12.5 up to BAL-FZ) under AS3959.

Once you have your report, use it to brief your architect or builder on specific construction requirements. A clear BAL rating upfront means your design can incorporate ember guards, non-combustible eaves and sealed wall junctions from the outset—reducing design changes and cost blow-outs.

Apply AS3959 Construction Standards

AS3959 prescribes detailed construction methods for each BAL category. For example:

• Non-combustible cladding (brick, fibre cement) at higher BALs
• Fine mesh screens on vents and windows to block embers
• Sealed gaps around doors, windows and service penetrations

Your builder will follow the consultant’s BAL report to select compliant materials—right down to the type of sealant and ember-resistant vents. Regular site checks during framing and lock-up ensure every junction, cavity and soffit meets the standard, keeping approvals on track and insurers happy.

Achieve NatHERS Energy Efficiency

Running a NatHERS assessment in parallel confirms your home’s thermal performance aligns with the NCC 2022 Whole-of-Home 7-star requirement. The thermal modeller will:

  1. Input your final plans, glazing specs and insulation details.
  2. Simulate energy flows to gauge heating and cooling loads.
  3. Recommend improvements—often simple tweaks such as higher-R-value batts, low-e glazing or adjusted eave overhangs.

Common strategies include optimising window placement for winter sun, adding bulk insulation in external walls and ceilings, and specifying double-glazed aluminium or timber frames. When your NatHERS certificate ticks the 7-star box, you’ll know your Bendigo home will be comfortable year-round and cost-effective to run. For more on passive strategies, see our guide to understanding passive home designs.

Step 6: Obtain Building Permits and Council Approvals

Before the digger hits the ground, you’ll need the green light from your local council. In Bendigo this typically means securing a planning permit (to ensure your design meets zoning and overlay requirements) and a building permit (to confirm compliance with the National Construction Code). If your site falls within a heritage precinct or environmental overlay, extra approvals may be required. Tackling this phase with care prevents costly delays and keeps your build on schedule.

Prepare Permit Documentation

A complete application makes for a swift approval. Assemble your final design package, which should include:

  • A detailed site plan: showing boundaries, setbacks, easements, contours and any existing structures
  • Floor plans and elevations: dimensioned layouts of each level plus north arrows and finish schedules
  • BAL report: your certified Bushfire Attack Level assessment, with recommended construction details
  • NatHERS certificate: demonstrating you meet the 7-star Whole-of-Home energy requirement
  • Structural and civil engineer’s details: footings, pier designs and stormwater connections
  • Specialist reports where relevant: heritage impact statements, arborist’s report or boundary survey

Have your consultant team collate these documents into a single PDF or A3-sized submission set, complete with a cover letter referencing any relevant Bendigo Planning Scheme overlays. Missing or unclear drawings are the most common reason for extra information requests and hold-ups.

Lodge and Track Applications

Most councils now accept online lodgement through their planning portals. After you’ve paid the lodgement fee, you’ll receive a reference number—use it to monitor progress and chase referrals. Key tips:

  • Assign one team member (designer or project manager) to follow up with the council planner
  • Be aware of statutory referral periods: certain applications may go to CFA or Heritage Victoria
  • Keep consultants on standby: your engineer or BAL assessor may need to respond to technical queries

Logging in regularly and establishing a point of contact at council ensures your application isn’t left stranded in limbo.

Respond to Conditions or Amendments

It’s rare for an approval to come back without any conditions. You might need to revise your plans to address landscaping setbacks, reduce site cut-and-fill or adjust window heights in a heritage zone. When this happens:

  1. Review the council’s comments with your designer—don’t guess at solutions
  2. Prepare marked-up drawings or a response letter clearly indicating changes
  3. Resubmit promptly, noting any fee or referral requirements for amended plans

A proactive approach to amendments keeps approvals ticking over and lets you shift quickly into construction once your permits are final.

Step 7: Choose and Appoint Your Builder

Selecting the right builder can make or break your project. In Bendigo, you want a licensed, experienced professional who understands local conditions—from clay soils to bushfire regulations—and who communicates clearly at every stage. Yarrington Construction ticks all those boxes with over twenty years of local expertise, transparent processes and a reputation for quality workmanship. Use the steps below to invite and evaluate tenders, verify credentials and meet your shortlisted builders on site before making the final appointment.

Issue and Evaluate Tenders

Begin by issuing a consistent tender brief to each builder, including your final plans, specifications, prime cost items and contingency allowances. This ensures you receive like-for-like quotes. When the tenders arrive, compare:

  • Inclusions vs exclusions: Check that each quote covers the same fixtures, finishes and site works.
  • Prime cost allowances: Watch for allowances set too low—they often lead to substitutions later.
  • Payment terms: Ensure the builder’s schedule aligns with your construction-loan drawdown plan.
  • Variations process: Understand how changes will be priced and approved.

A detailed tender comparison highlights hidden costs and clarifies each builder’s approach to scope and budget management.

Verify Builder Credentials

Don’t rely on a glossy brochure—confirm your builder’s standing with the Victorian Building Authority (VBA) and verify their insurances. You should:

  • Check the VBA register for licence class, expiry and any disciplinary history.
  • Request certificates of public liability and professional indemnity insurance, noting coverage limits.
  • Ask for three recent client references, ideally for projects of similar size and complexity.
  • Review online testimonials and any industry awards to gauge consistent performance.

This due diligence protects you from unlicensed work and ensures your builder has the technical and financial backing to deliver.

Conduct Builder Interviews and Site Visits

Shortlist two or three builders for face-to-face interviews. Prepare questions such as:

  • How do you handle unexpected site challenges—rock excavation, drainage issues or wet weather?
  • Who will manage the site daily, and how will I receive progress updates?
  • Can you show examples of homes built to NatHERS 7-star or AS3959 BAL standards?
  • How do you coordinate subcontractors and manage material lead times?

After each meeting, visit an active project. Look for tidy, well-organised sites, respectful treatment of neighbours and strict adherence to safety and environmental controls (sediment fences, wheel-washes, ember guards). Observing a builder in action reveals details you won’t find on paper.

With your due diligence complete, you’ll be ready to appoint a builder who meets your criteria for cost, quality, communication and sustainability. Your next step is drafting a contract that clearly sets out the scope, payment terms and warranties—so you can move confidently into construction.

Step 8: Sign the Contract and Finalise the Build Scope

With your builder selected, the contract transforms your vision into a legally binding roadmap. This document should spell out every aspect of the build—from the precise scope of work to how changes are handled, payment stages, warranty terms and dispute-resolution procedures. Taking the time to choose the right contract model and review every clause with your solicitor and designer will save headaches (and costs) down the track.

Before you sign, make sure you understand the two primary contract types, confirm exactly what’s included (and excluded), and attach all relevant scopes, plans and allowances so there’s no room for misinterpretation.

Select the Appropriate Contract Model

Broadly speaking, you’ll choose between:

  • Fixed-price (lump sum): The builder agrees to complete the works for a set price.
    • Pros: predictable budget, clear cost cap.
    • Cons: may encourage cost cutting if unexpected costs arise; less flexible for design changes.
  • Cost-plus (time and materials): You pay actual costs plus an agreed margin or fee.
    • Pros: full transparency on expenditure, easier to incorporate bespoke or sustainable items.
    • Cons: less cost certainty, requires strong trust and regular oversight.

If energy-efficient features or high-end fixtures matter to you, consider quarantining part of your budget for those items—separate from the main contract sum. This “sustainability allowance” ensures eco-friendly upgrades aren’t the first casualty of a tight build.

Agree Scope, Variations and Allowances

A clear, unambiguous scope of work prevents disagreements later on. Your contract should:

  • Describe every item: materials, finishes, fixtures and landscaping works.
  • List exclusions: things the builder won’t supply or install.
  • Detail the variations process: how changes are requested, priced and approved.
  • Outline prime-cost allowances for high-value items (e.g. kitchen appliances, taps).
  • Include penalty clauses for unauthorised substitutions or missed deadlines.

Ask your designer to cross-check finish schedules and prime-cost items against your budget breakdown—this step ensures the tender accurately reflects your expectations.

Final Contract Review and Execution

Before signing on the dotted line:

  • Confirm all drawings and specifications are attached (site plan, floor plans, elevations).
  • Verify contingency sums and prime-cost schedules are correctly itemised.
  • Ensure insurance certificates and builder warranties (including workmanship and structural guarantees) are included.
  • Run through a contract checklist with your solicitor and designer to spot any missing or ambiguous clauses.

Once every appendix is in place and you’re happy with the payment schedule, sign the contract and request a fully executed copy. With this foundation set, you’re ready to hand the keys of your design over to your builder and move into the excitement of construction.

Step 9: Prepare the Site—Clearing, Excavation and Foundation Works

Before foundations can be poured, your block needs a careful transformation from raw land to a build-ready site. This phase involves clearing vegetation, protecting retained areas, cutting and filling the ground to the correct levels, and installing structural footings. With Bendigo’s clay soils and potential for runoff, attention to erosion control and engineer-approved set-out is vital to avoid delays and extra costs.

Site Clearing and Erosion Control

The first task is to define your Asset Protection Zone (APZ) around the future building footprint. Within this area, combustible vegetation is removed to reduce bushfire fuel loads, in line with your BAL assessment. Beyond the APZ, retained trees and shrubs are fenced off and protected from machinery.

At the same time, sediment control measures—such as silt fences and rock-bagged drains—are installed along the perimeter of the site. These barriers minimise soil erosion and prevent sediment washing onto neighbouring properties or into local waterways during rain. Your builder will coordinate with the civil engineer and environmental officer to ensure all controls comply with local council and EPA requirements.

Excavate and Set Out Foundations

Once clearing is complete, a licensed surveyor or builder will peg out the exact positions for footings, service trenches (electrical, plumbing, stormwater) and any retaining walls. Using contours and levels from your site survey, machinery will excavate trenches and batter slopes as specified in the engineer’s detail drawings.

At this stage:

  • Trenches for under-slab drainage and termite barrier systems are dug to the depths indicated.
  • Service trenches for sewer and stormwater lines are cut with the correct fall—and marked to avoid rework.
  • Any cut-and-fill necessary to achieve design levels or create a pad for a split-level home is performed, with excess soil stockpiled for later use in landscaping.

Throughout excavation, a geotechnical engineer inspects compaction and soil conditions, confirming whether any ground remediation (e.g. additional compaction or chemical stabilisation) is required before footings proceed.

Pour Footings and Slab

With trenches approved by your engineer, formwork and steel reinforcing (rebar or mesh) are placed according to the structural drawings. Next, concrete footings are poured, typically to a depth and width suited for Bendigo’s reactive clay and the load of your home. Once the concrete reaches the required strength, the builder will:

  1. Lay a durable moisture barrier across the slab area.
  2. Install a continuous termite management system beneath and around all external walls—either a physical stainless-steel mesh or chem-seal.
  3. Position under-slab drainage pipes to direct water away from the building envelope and into lawful discharge points.
  4. Place control joints in the slab to manage cracking and allow for shrinkage.

During and after pouring, the concrete undergoes curing protocols to achieve design strength. A compaction test report and engineer’s sign-off on the footings and slab ensure that your home rests on a stable, compliant foundation—ready for the next stage of framing and roof installation.

With the groundworks complete and the slab in place, you’ve laid the literal groundwork for a durable, settlement-resistant home that meets both bushfire and energy-efficiency requirements. Up next: Step 10, where the structure starts to take shape with framing and roof works.

Step 10: Build the Structure—Framing and Roof Installation

With your slab cured and ready, the build really takes shape at Step 10. This is when timber (or steel) studs transform a flat pad into walls, rooflines appear on the horizon and your home begins to look like… well, a home. Framing sets the structural backbone, roof installation locks out weather and, when done right, ensures your Bendigo build meets both engineering and bushfire-rating requirements. Attention to detail here saves headaches later, so expect frequent quality checks and compliance sign-offs as walls rise and the roof goes on.

Erect Wall and Roof Frames

Framing usually starts with the external walls. Your builder will:

• Lay out stud positions following engineer’s set-out.
• Fix treated pine (or steel studs in higher BAL zones) to slab anchors using tie-down straps or anchors designed for Bendigo’s wind loads.
• Install bracing panels or wall bracing rods at prescribed intervals to resist racking forces.

Once walls are plumb and secured, internal partition studs go up. Then roof framing begins: prefabricated trusses are craned into position, bearing on wall plates, and secured with metal connector plates and tie-down straps. Collar ties, ridge beams and ceiling battens complete the skeleton of your roof. Throughout this process, Yarrington’s team checks each member for straightness, correct spacing (typically 450 mm centres) and proper fixings—critical for both structural integrity and meeting AS1684 and AS3959 (BAL) requirements.

Apply Sheathing and Weatherproofing

With the bare frame in place, it’s time to clad and seal:

  1. Structural Sheathing: Oriented Strand Board (OSB) or fibre-cement panels are nailed to studs, providing lateral strength and a substrate for external cladding. Fixings are set to manufacturer’s specifications—no shortcuts here.
  2. House Wrap: A breathable, water-resistant membrane is overlaid on sheathing, taped at seams and around openings to keep moisture out while letting internal vapour escape. This step is crucial in Bendigo’s climate, where summer storms can follow scorching days.

Sheathing plus wrap form your primary weather barrier. Proper overlaps, tape grades and flashing around window and door openings are verified before moving on.

Install Roof Structure and Underlay

Finally, your roof is dressed to keep the elements—and embers—at bay:

Roof Underlay (Sarking): Installed across battens or purlins, this breathable layer offers a second line of defence against wind-driven rain and ember attack in BAL-rated areas.
Battens and Purlins: Fixed over sarking, they support your final roof finish—whether it’s tile battens for terracotta, battens for Colorbond sheeting or timber battens for slate.
Truss Bracing and Strapping: To meet wind-region requirements, each truss is braced and tied down according to engineer’s plans and local code.

Once underlay, battens and flashings are inspected, the roof is water-tight and lock-up stage approaches. From here, you’ve weatherproofed your shell and can move safely into window installations, external doors and internal fit-outs.

Step 11: Enclose and Weatherproof—Lock-Up Stage

Once the frame, sheathing and underlay are in place, it’s time to bring your home to lock-up stage. This phase seals out the weather and secures the shell, protecting internal fit-outs and services from wind, rain and ember attack. A proper lock-up not only safeguards your investment but also ensures your build stays on schedule, with minimal exposure to the elements.

Fit Windows and Doors

High-performance windows and doors are critical at lock-up. In Bendigo’s bushfire-prone areas, choose products tested to your BAL rating—complete with fine-mesh ember guards and corrosion-resistant seals. For energy efficiency, specify thermally broken frames, double-glazed Low-E glass and airtight seals to meet your NatHERS 7-star targets. Installors should level and flash each opening meticulously, ensuring sills slope away from the wall and any gaps are sealed with appropriate fire-rated sealant.

Complete Roof Covering and Drainage

With windows and doors in place, the final roof finish can go on. Whether you’ve chosen terracotta or concrete tiles, Colorbond steel or slate, ensure battens and flashings align with manufacturer’s specifications and AS/NZS 1562.1. Install gutters and downpipes at this time, checking falls into stormwater lines and positioning leaf-blockers if required. If you’re planning rainwater harvesting, ensure inlet points and first-flush diverters are linked to the downpipe network before the final coat of roof paint or protective finish.

Seal the Building Envelope

A true lock-up goes beyond doors and windows. Walk the perimeter to inspect and seal any remaining junctions—around roof penetrations, service entries and control joints. Apply weather-proof tapes to sheathing overlaps, inject fire-rated foam or intumescent sealant where required by AS3959, and verify house-wrap integrity around corners and edges. Finally, perform a blower-door or visual air-leak test to confirm your envelope is continuous. At this point, your home is dry, secure and ready for the internal trades to move in without risk of weather damage or energy loss.

Step 12: Install Services—Plumbing, Electrical and HVAC

With your home locked up and weather-tight, it’s time to bring in the essential services. At this stage, plumbers, electricians and HVAC technicians work in tandem—running pipes, cables and ducts through walls and ceilings before the interior lining goes on. Proper sequencing, code compliance and sign-offs at each rough-in point ensure your Bendigo build will operate efficiently, safely and to the standards set by council and private certifiers.

Rough-In Plumbing and Drainage

Rough-in plumbing covers everything from your mains water supply to sewer and stormwater lines. The process typically begins with laying out hot- and cold-water pipes, installing connection points for bathrooms, kitchen, laundry and any external taps. Drainage trenches carry waste and stormwater away from the slab, with careful attention to the required fall (usually around 1–2% gradient) to prevent backflow.

Key steps and checks:

  • Mark and trench for sewer and stormwater pipes, ensuring all lines fall away from the house.
  • Install water meter, backflow prevention devices and any gas lines if you’ve chosen gas cooking or heating.
  • Pressure-test water and drainage lines under a minimum 150 kPa for at least two hours to detect leaks.
  • Fit roof-water downpipes and connect to a first-flush diverter if you’re harvesting rainwater.
  • Arrange a council or private plumbing inspection at rough-in to certify compliance with the Plumbing Code of Australia and relevant Australian Standards.

Completing these tasks correctly now avoids disruptive rework once your gyprock goes up.

Run Electrical Wiring and Panels

Next, electricians take charge of wiring and switchboards. They’ll install conduits, circuit cables, data and TV points, smoke-alarm wiring and the main switchboard in its designated cupboard. Early planning for home-automation or solar inverter connections pays dividends here.

Considerations for a smooth electrical rough-in:

  • Develop a circuit plan showing dedicated feeds for ovens, hot-water systems and air conditioners.
  • Position light and fan points, power outlets, double-power points and data sockets according to your lighting and furniture layout.
  • Install RCDs, safety switches and surge protection in the switchboard to comply with AS/NZS 3000 (the Wiring Rules).
  • Leave spare conduits or “blank” back boxes for future CCTV, security alarms or extra lighting.
  • Book an electrical inspection once wiring is complete but before wall linings—council or private certifier review is mandatory for occupancy.

Planning flexibility and safety at this stage means you won’t be chasing cables behind finishes later.

Install HVAC Systems

Finally, your HVAC technicians install ductwork, air handlers, condensing units and controls. Whether you’ve opted for reverse-cycle split systems, ducted air-conditioning or hydronic heating, every component must be positioned and commissioned precisely.

Key HVAC tasks:

  • Route and seal all ducts through bulkheads and ceiling spaces, insulating them to prevent energy loss.
  • Mount the indoor air-handler (or evaporator) on antivibration mounts and install the outdoor condenser on concrete pads.
  • Run refrigerant lines and electrical connections between indoor and outdoor units, ensuring minimum bend radii.
  • Position thermostats in central, draught-free zones for accurate temperature sensing.
  • Conduct airflow balancing tests and refrigerant-charge checks, then sign off on compliance with manufacturer specifications and NCC energy-efficiency requirements.

With each service inspected and certified, you’ll have peace of mind that plumbing, wiring and climate control systems are robustly installed—ready for insulation, linings and the final fit-out.

Step 13: Complete Interior Fit-Out—Fixtures, Finishes and Insulation

Now that your plumbing, electrical and HVAC services are in place, it’s time to bring the interior to life. This phase focuses on thermal comfort, airtightness and the look and feel of every room. Proper sequencing and high-quality workmanship ensure your home not only looks spectacular but performs efficiently year after year.

Install Insulation

Bulk insulation is your first line of defence against heat, cold and noise. In Bendigo’s variable climate, aim for:

  • Ceiling insulation: R-values of R5.0 to R6.0 to limit summer heat gain and winter heat loss.
  • Wall insulation: R2.5 to R3.5 batts in external walls, with careful installation around windows and doors to avoid gaps.
  • Underfloor insulation (if applicable): foil-backed or polyester batts in suspended timber floors to reduce draughts and improve energy efficiency.

Key points:

  • Work with an experienced installer who follows the manufacturer’s fixing guides and avoids compression of batts.
  • Seal around penetrations—lights, services and downlights—with fire-rated sealant to maintain your BAL and air-tightness targets.
  • Vent ceiling spaces to prevent moisture build-up and timber decay.

A well-insulated shell reduces heating and cooling loads, helping you meet or exceed your NatHERS 7-star rating.

Hang and Finish Gyprock

With insulation settled, the next step is lining your walls and ceilings. Gyprock (plasterboard) installation involves:

  1. Board placement: Moisture-resistant boards in wet areas (bathrooms, laundries) and standard boards elsewhere, fixed at 300–450 mm centres.
  2. Taping and jointing: Applying paper or mesh tape over joins, embedding it in joint compound, then smoothing to a flush finish.
  3. Texture or skim coat: Choose a finish—smooth skim for a contemporary look, or a fine texture to mask minor imperfections.

Best practices:

  • Ensure boards are dry, square and aligned to avoid uneven joints.
  • Allow sufficient drying time between coats of mud, then sand lightly to avoid dust embedding.
  • Prime the gyprock before painting to seal the surface and improve paint adhesion.

A precise internal lining stage lays the groundwork for crisp corners, straight walls and perfect transitions to your finishes.

Fit Fixtures, Joinery and Finishes

This is where your vision truly takes shape. Coordinating trades and sequencing is vital:

  • Painting: Apply quality undercoat and two topcoats of low-VOC paint. Tackle ceilings first, then walls, trimming carefully around joinery.
  • Tiling: Set out wet areas with level screeds, then tile walls and floors using the appropriate grout (epoxy grout for shower recesses).
  • Cabinetry and benchtops: Install kitchen, bathroom and laundry cupboards, then fit stone, laminate or timber benchtops—remember to seal all cut-outs for sinks and cooktops.
  • Sanitaryware and tapware: Fit basins, baths, showers, toilets and mixers, aligning spouts and ensuring watertight seals to walls and floors.
  • Light fittings and power outlets: Finalise downlights, pendants and switches, plugging in appliances and checking each circuit.
  • Floor finishes: Lay your choice of floorboards, tiles or carpet—ensuring transitions between materials are neat, level and sealed where needed.

Throughout fit-out, Yarrington Construction’s site manager conducts regular quality inspections, marking any touch-ups on a snag list so your home is delivered spotless and trouble-free.

With insulation tucked in, walls and ceilings dressed, and all fixtures expertly installed, you’re on the home straight. Your interior spaces now reflect both your style and the exacting standards that make a home comfortable, efficient and built to last.

Step 14: Conduct Inspections and Quality Checks

Before you pop the champagne, your new home needs a thorough inspection to ensure everything meets your expectations, the contract and regulatory standards. Skipping this step can lead to costly fixes later—or worse, safety hazards. By systematically checking work and securing the right certificates now, you’ll enjoy peace of mind that your Bendigo build ticks every box.

Perform Snagging Walkthrough

A snagging walkthrough flags any unfinished or imperfect work before final handover. Here’s how to tackle it:

• Schedule a joint inspection with your builder and designer at practical completion.
• Use a detailed checklist covering:

  • Interior finishes (paint, tiling, cabinetry)
  • Door and window operation (smooth glides, proper seals)
  • Plumbing and fixtures (no leaks, correct alignment)
  • Electrical fittings (functioning powerpoints, switches and lights)
  • Flooring (even joins, secure fixings)
    • Photograph every defect—annotate with location, date and responsible trade.
    • Prioritise items by severity (safety first, then functionality, then aesthetics).
    • Agree on a remediation timetable, capturing dates for repairs and sign-off milestones.

Documenting snags clearly ensures your builder addresses them promptly, avoiding misunderstandings about who fixes what and when.

Secure Final Certification

Once all snags are noted, it’s time to confirm compliance with building regulations:

  1. Building Permit Finalisation
    • Arrange a final inspection with your private certifier or council building surveyor.
    • Present evidence of completed works, including structural elements, waterproofing and fire-rated installations.
  2. Bushfire Compliance (BAL) Sign-Off
    • Show your BAL consultant the finished ember guards, seals and non-combustible materials.
    • Obtain a compliance certificate confirming AS3959 standards have been met.
  3. NatHERS and Energy Certificates
    • Verify that insulation, glazing and passive features align with your 7-star model.
    • Secure your NatHERS certificate for inclusion in your home owner’s manual.

Gathering these documents not only fulfils legal requirements but also reassures insurers and future buyers that your home was built to exacting standards.

Rectify Defects and Sign-Off

With approval certificates in hand, the final step is resolving any outstanding issues:

• Review the builder’s defect report and compare with your snag list—no surprises.
• Track each item in a shared schedule, noting completion dates and sign-off signatures.
• Confirm that warranty terms cover any remedial work, and understand how to lodge future claims.
• Host a final meeting—ideally on site—to walk through the completed fixes and sign off on overall satisfaction.

This transparent process closes the loop on quality control, ensuring you take possession of a home that’s safe, compliant and finished to the standard you agreed.

By conducting thorough inspections and securing all certifications before handover, you safeguard your investment and lay the groundwork for a seamless transition into the next—and final—phase: handover and post-completion care.

Step 15: Handover and Post-Completion Care

After months of careful planning, approvals, construction and inspections, you’ve reached the finish line. Handover day is when you step across the threshold of your brand-new Bendigo home. But the process doesn’t end with a set of keys—it also involves transferring knowledge, documentation and ongoing support so you can live in and maintain your home with confidence. A structured post-completion phase ensures you get the most out of your investment and know exactly who to call should any issues arise.

Receive Keys, Manuals and Warranties

At the handover meeting, your builder will provide:

  • Keys and remotes for all external doors, garages and security systems.
  • An as-built drawing set reflecting any on-site changes made during construction.
  • A comprehensive Owner’s Manual covering everything from heating and cooling controls to gutter cleaning and paint touch-ups.
  • Certificates and compliance documents, including your final building permit sign-off, BAL compliance, NatHERS rating and any specialist reports.
  • Warranty information detailing cover periods for structural elements, workmanship and appliances, plus contact details for each warranty provider.

Review each document carefully, initial any sign-off sheets, and store all paperwork in a dedicated folder or digital file. This becomes your go-to reference for maintenance schedules, system operations and future resale.

Review Maintenance and Operation Procedures

A well-maintained home runs smoothly and retains its value. As you settle in:

  1. Walk through your Owner’s Manual with the builder or project manager. Note seasonal tasks—gutter clearing, solar hot-water cleaning, termite inspections—and mark them in your calendar.
  2. Test all systems: run the air-conditioning, operate sliding doors, check irrigation timers and verify kitchen appliances are functioning correctly.
  3. Inspect external features like downpipes, drainage outlets and decking to ensure water flows away from the building and no fixings have loosened during settling.
  4. Schedule service appointments: book your first HVAC filter change, hot-water system service and pest-control inspection within the first six months to secure warranty cover and detect any early issues.

Treat these steps as preventative measures, not chores—they protect your comfort, efficiency and the longevity of every component in your home.

Engage Warranty and After-Care Support

Even the most meticulous build can reveal minor defects once the home has occupied for a few weeks. Yarrington Construction’s after-sales care includes:

  • A defect-lodgement process: simply log issues via email or phone, attaching photos or location details.
  • A response timeline: our team will arrange a site visit within days and schedule any remedial work promptly.
  • Annual check-ins: optional walkthroughs at the six-month and twelve-month marks to catch small defects or advise on new upgrades—be it an extension, a deck or energy-saving retrofits.

We pride ourselves on standing by our work well after handover. Whether you need help adjusting your solar inverter, topping up external sealants or planning a future room addition, our experts are just a call away.


Ready to start building your dream home in Bendigo—and enjoy seamless care long after you move in? Reach out to the team at Yarrington Construction to discuss your next project.